Below you will find some of our Finished Projects.
RTSH building, “Shyqyri Ishmi” Street
The project carried out in Tirana by the company LIM-EM sh.p.k., which included drilling of Ø 800 diameter piles and installing anchors with all the necessary materials, was successfully completed in 2025.
Project: VIVA Building, “Javer Malo” Street, behind Globe Center, Tirana
The project carried out in Tirana by the company LIM-EM sh.p.k. included drilling of piles with diameters of Ø 600 to Ø 800 and installing anchors with all necessary materials, and was successfully completed within the period 2023-2024.
Residential & Service Building 12 floors, with three floors of underground parking, “Myslym Shyri” Street
The project carried out in Tirana by the companies Matrix sh.p.k. and Unicon sh.p.k. included the drilling of Ø 800 diameter piles and the installation of anchors with all necessary materials, and was successfully completed within the period 2022-2023.
Zoo, Residential & Service Building with 5 floors of underground parking
The project carried out in the Zoological Garden, Tirana, by the company Salillari sh.p.k., which included the drilling of Ø 800 diameter piles in various lengths, with or without a jacket from us, the supply of tie rods and 6-cable tie rods, as well as drilling and injection with a continuous cycle plant, has been successfully completed within the period 2022-2023.
Drilling of Bridge Pillars and Legs, Construction of the Shqiponja Square Overpass
The project carried out in Tirana by the company Salillari sh.p.k., which included the drilling of Ø 800 diameter piles at a depth of 10 linear meters, Ø 1000 at a depth of 10 to 15 linear meters, and Ø 1200 at a depth of 17 to 30 linear meters, has been successfully completed within the period 2021-2023.
Construction of the Vlora River Road, Lasko Bridge – Qeparo Segment
The project carried out in Vlora, by the company Alb-Star sh.p.k., which included the drilling of Ø 1200 diameter piles, was successfully completed in 2022.
Residential & Service Building 10 floors, with 2 floors of underground parking, Nikolla Lena Street, Administrative Unit No. 7
The project carried out in Tirana by the company Future Enterprise Investment sh.p.k., which included the drilling of piles with diameters of Ø 800 and Ø 1200, as well as the implementation of anchors including all construction materials, has been successfully completed in 2022.
Road and Bridge Works – Kukës Morinë – National Road
The project carried out in Kukës by the company Salillari sh.p.k., which included drilling of piles with diameters of Ø 1200 and Ø 1000 at depths of 15 to 30 linear meters in rocky soil, has been successfully completed within the period 2021-2022.
Residential & Service Building up to 9 floors, with 3 underground floors, Islam Alla Street
The project carried out in Tirana by the company S.AG sh.p.k., which included the drilling of piles with diameters of Ø 800 and Ø 1200, the implementation of anchors including all materials, as well as the construction of a residential and service building up to 9 floors with 3 underground floors, was successfully completed in 2021.
Drilling of Side Piles in the residential building in Vlora
The project carried out in Tirana by the company Enid Konstruksion sh.p.k., which included the drilling of Ø 800 diameter piles, the supply of connecting rods with 5 cables, as well as drilling and injection with a continuous cycle plant, was successfully completed in 2021.
Health Center with 5 and 7 floors with 2 floors of underground parking on Ali Spahiu Street
The project carried out in Tirana by the contractor Lindita Hoxha PF - Dermolife, which included the drilling of Ø 800 diameter piles and the construction of a 5- and 7-story Health Center, including 2 floors of underground parking, was successfully completed in 2021.
Construction of Housing and Residential Services in Laprake.
The project carried out in Tirana by the company 2S-J Konstruksion sh.p.k., which included the drilling of piles with diameters of Ø 600 and Ø 800, as well as other works such as field pilot works, reinforced concrete structure, foundation slab, retaining walls, preparation and placement of steel, was successfully completed in 2020.
Seven entrance mooring beams as Moglice HPP
The project carried out in Moglica by the company Devoll Hydropower Sh.a., which included the rear extension of the anchor beam, was successfully completed in 2020.
Rehabilitation of the River Road in Vlora Lot 3
The project carried out in Vlora by the company Alb-Star sh.p.k., which included bored piles with a diameter of Ø 1200 for bridges and reinforcements, using 4 concrete piles with HD specification and a length of 1×29 meters, was successfully completed in 2020.
Pilot drilling, reinforcement of lateral piles in the Hotel building in Vlora
The project carried out in Vlora by the company Adhenis sh.p.k., which included the drilling of Ø 600 diameter piles, was successfully completed in 2020.
Devolli Hidropower – Road and Bridge Construction – Moglice Norh Shore “
The project carried out in Korça by the company ALB-STAR sh.p.k. (in collaboration with Statkraft), which included drilling of 1.2-meter diameter piles at depths of up to 20 meters, drilling of 0.8-meter diameter piles, implementation of anchors including all materials, as well as transportation and concreting of the piles, was successfully completed in 2019.
Pilot drilling for “TAP Pilot”
The project carried out in Korça by the company ALB-STAR sh.p.k., which included the drilling of Ø 800 ml diameter piles in soil mixed with rocky parts at a depth of 21 linear meters with iron collars, as well as the drilling of Ø 900 ml diameter piles in the same rocky soil conditions, was successfully completed in 2018.
Lateral Piling Drilling for “Residential Building 3,4 and 5 floors, Ligor Rembeci Korce”
The project carried out in Korça, Albania, by the company Bregu sh.p.k., which included the drilling of Ø 600 and Ø 800 diameter piles, was successfully completed in 2019.
Children's playground & 2-storey public parking on Elbasani Street
The project carried out in Tirana by the company SALILLARI sh.p.k., which included drilling of Ø 1200 diameter piles and excavation in the ground, was successfully completed in 2018.
Pilot drilling for “TAP Pilot II”
The project carried out in Albania by the company ALB-STAR sh.p.k., which included drilling to a depth of 45 to 50 linear meters, partially including drilling with a diameter of Ø 800 from the outside and Ø 720 from the inside at a depth of 15 to 20 meters, was successfully completed in 2019.
Residential building in Tirana, near the 17 November Cinema
The project carried out in Tirana by the company TDT & Partners sh.p.k., which included the drilling of Ø 800 diameter piles, was successfully completed in 2017.
Excavation of the ground for the R-1202 Boshkov Most road
The project implemented in the Republic of North Macedonia by the company EURO EDIL HONDING DOEL, which included the drilling of Ø 600 and Ø 800 diameter piles, was successfully completed in 2017.
1,200 mm pilot drilling “Construction of Qukë-Qafë”
The project carried out on Pllocë Road, a section of the Tirana-Korça Road Corridor, by the company ALB-STAR sh.p.k., which included the drilling of Ø 1200 mm diameter piles, was successfully completed in 2017.
Concrete supplies for various and third-party constructions
The facility is located in the industrial area of Rinas, Tirana, and was developed by the company S.AG shpk. The facility has a construction area of 10,000 m² and is conceived as a modern production unit, built according to the latest industrial engineering standards. The facility offers an optimal production capacity of 1,000 m³ per day, positioning it among the most efficient production units in the relevant sector. The infrastructure is designed to ensure high functionality, optimal material flow and high safety and environmental standards.
Public Buildings
The company S.AG shpk, an entity with experience in the implementation of public works. The activity includes interventions and construction in various public institutions, including schools, state offices and other institutional environments.
3-story building with basement and 1 underground floor
The project is located in Selitë, Municipality of Tirana, and is being implemented by S.AG shpk. With an area of 5,000 m², the multifunctional building includes 3 floors above ground and 1 underground floor for parking. The facility is under construction and will serve residential, commercial and administrative purposes, according to modern standards.
Multifunctional building 3 and 4 floors with basement 1 parking floor – Zoo
The project is located in the Zoological Garden area, Municipality of Tirana, and is being implemented by the company S.AG shpk. With a construction area of 5,000 m², the facility represents a multifunctional building with 3/4 floors above ground and 1 underground floor for parking. The building is under construction and is designed for residential, commercial or administrative functions, according to contemporary standards.
Multifunctional Building 10+2 underground floors – Shinasi Dishnica Street
The project is located on “Shinasi Dishnica” Street, Tirana Municipality, and is being implemented by the company S.AG shpk. With a construction area of 12,000 m², the facility represents a multifunctional building with 10 floors above ground and 2 underground floors for parking. The building is designed for residential, commercial or administrative functions and is built according to contemporary standards
Multifunctional Building 10+1 underground floors – Islam Alla Street
The project is located on “Islam Alla” Street, Tirana Municipality, and is being implemented by the company S.AG shpk. With a construction area of 12,000 m², the facility is a residential building with 10 floors above ground and 1 underground floor for parking. The building is under construction and aims to offer modern living conditions in accordance with current construction standards.
Residential Complex 10+1 underground floors – New Ring Road
The project is located in Unazë e Re, Municipality of Tirana, and is being implemented by the company S.AG shpk. With a construction area of 24,900 m², the facility is a residential building with 10 floors above ground and 1 underground floor for parking. The building is under construction and will offer modern living conditions, meeting the latest construction standards.
Multifunctional Building 5+2 underground floors – PERGOLA
The project is located on “Asim Zeneli” Street, Tirana Municipality, and is being implemented by the company S.AG shpk. With a construction area of 5,600 m², the facility represents a multifunctional building with 5 floors above ground and 2 underground floors for parking. The building is under construction and will serve various functions, offering modern spaces for residential, commercial or administrative use.
Multifunctional Building 3+2 underground floors – FARI
The project is located in the Artificial Lake, Municipality of Tirana, and is being implemented by the company S.AG shpk. With a construction area of 4,000 m², the facility is a multifunctional building with 3 floors above ground and 2 underground floors for parking. The building is under construction and will serve various functions, offering modern spaces for residential, commercial or administrative use.
Multifunctional Building 4+2 underground floors – Dry Lake
The project is located in Liqenin Thatë, Municipality of Tirana, and is being implemented by the company S.AG shpk. With a construction area of 8,000 m², the facility is a multifunctional building with 4 floors above ground and 2 underground floors for parking. The building is under construction and will serve various functions, offering modern spaces for residential, commercial or administrative use.