Rehabilitation of the River Road in Vlora Lot 3
Location: Vlorë, Shqipëri
End Date: 2020
Description: Drilling pile 1200 for bridges/reinforcements 4x concrete with HD 1×29 m
Main Features:
The S.AG company has carried out geotechnical pile drilling for road stabilization, especially in areas with weak soil such as clay, peat or sloping areas. These works are distinguished by:
- Average depth: Piles are usually installed at 5-20 meters, sufficient to transfer loads to stronger soil layers.
- Lightweight and efficient pilots: Prefabricated or reinforced concrete piles with smaller diameters are used to optimize construction cost and time.
- Resistance to deformation: The design of the piles focuses on preventing collapses and landslides of the roadbed from traffic and precipitation.
- Adaptation to the terrain: S.AG carries out geological analyses to determine the distance and density of piles, adapting to specific conditions such as swamps or slopes.
- Speed of execution: Mobile machinery is used for rapid drilling, enabling rapid progress on road projects.
These features make S.AG's road works durable and suitable for various geological conditions.
Realization and Construction Achieved
S.AG has carried out geotechnical pile drilling for road construction and stabilization, especially in difficult terrain with weak soil such as clay or peat, as well as in sloping areas. These works are carried out to prevent collapses, landslides and deformations of the roadbed due to traffic loads and atmospheric conditions. S.AG has used reinforced or prefabricated concrete piles, usually installed at a depth of 5-20 meters, to transfer the load to stronger soil layers. For example, on a highway over a swampy area, S.AG has carried out drilling to create a stable base for asphalt layers, relying on detailed geological analyses to determine the positioning and depth of the piles.